My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41040
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:50 PM
Creation date
11/20/2007 10:36:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 13 ATTACHMENT E SEDIMENTATION POND 005
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Storage Capacity <br />• 1 The storage capacity of Sediment Pond 005 was also analyzed using the <br />SEDIMOT II computer program. Table 6 is a summary of the designed <br />storage capacity. <br />TABLE 6 <br />Design Storage Capacity Summary <br />Sediment Pond 005 <br /> Stage Capacity <br />Elevation (Feet) (Ac-ft) Description <br />5690.0 0.0 0.00 Bottom of Pond <br />5694.0 4.0 0.42 Elevation of Principal <br /> Spillway and 100 <br /> Sediment Storage <br />5699.04 9.04 1.50 10-year, 24-hour Peak <br /> Stage <br />5700.06 10.06 1.82 25-year, 24-hour Peak <br /> Stage <br />5701.0 11.0 2.20 Elevation of Emergency <br />' Spillway <br />5702.53 12.53 2.94 100-year, 24-hour Peak <br /> Stage <br />5703.0 ~ 13.0 3.19 Elevation of the Top <br /> of the Embankment <br />Peabody does not anticipate any pit pumpage or other inflow to the pond <br />at this time. <br />SPILLNAY <br />Sediment Pond 005 provides for a combination of principal-emergency <br />spillway to safely discharge the runoff from a 25-year, 24-hour storm. <br />The principal spillway inlet will also be used as the nonclogging <br />dewatering device and is located at an elevation higher than the maximum <br />sediment storage volume. The principal spillway inlet is located in a <br />position on the embankment so as to prevent short-circuiting as much as <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.