My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41038
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:50 PM
Creation date
11/20/2007 10:36:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Permit File
Doc Date
9/8/1995
Doc Name
SECOND ADEQUACY REVIEW AND PRELIMINARY BOND CALCULATION 112 PERMIT APPLICATION WEBER SAND & GRAVEL W
From
DMG
To
WEBER SAND AND GRAVEL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Second Adequacy Review <br />Weber Pi[ 2 <br />3 <br />9/8/95 <br />M-95-056 <br />Please find attached, eighteen (18) pages of worksheets and calculations, utilized by DMG to <br />determine the amount of financial warranty required. The eighteen pages are organized as follows: <br />RECLAMATION COST SUMMARY FORM -four (4) page summary listing the cost for <br />each work task identified by DMG as being necessary to complete the reclamation plan; <br />ESTIMATING FORM -BULLDOZER WORK -four (4) pages itemizing the costs <br />associated with bulldozer tasks -tasks 1 through 4; <br />ESTIMATING FORM - REVEGETATION WORK -two (2) pages itemizing the costs <br />associated with ensuring successful revegetation for disturbed areas -task 6; <br />ESTIMATING FORM -EQUIPMENT MOBILIZATION/DEMOBILIZATION -two (2) <br />pages itemizing costs associated with transporting dozer, excavator, and revegetation <br />equipment from Pagosa Springs to job site -task 7. Under scenario of permit revocation <br />and/or forfeiture of financial warranty, equipment owned by Weber Sand & Gravel and <br />located on site, may not be available for reclamation work, thus necessitating task 7; <br />DOZER COST & PERFORMANCE DATA WORKSHEET -two (2) pages itemizing cost <br />associated with dozer model identified by DMG, as being best suited for tasks 1 through 4; <br />HYDRAULIC EXCAVATOR COST & PERFORMANCE DATA WORKSHEET -two (2) <br />pages itemizing cost associated with tracked excavator model necessary to place riprap <br />lining in drainage ditches, see task 5 on SUMMARY FORM. Cost for task 5 was taken <br />from Means Site Work & Landscape Cost Data. 1995. 14th Annual Edition, page 47. <br />Labor and equipment cost for machine placed riprap totals $13.65 per cy; and <br />FLATBED TRUCK COST DATA WORKSHEET -two (2) pages itemizing cost associated <br />with one delivery trip to site. <br />Please contact me at the Durango Field Office, 1474 Main Ave., Room 207, Durango, CO 81301, <br />telephone number 247-5062, should you have any questions or comments. <br />Sincerely, <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.