Laserfiche WebLink
• <br />Colorado Division of Minerals and Geology <br />ESTTMATING FORM - BULLDOZER WORK <br />Task #: 4 Prep. by: WI1E Task File Name: M056-4 <br />Date: 09/07/95 Permit #: M-95.056 Hine: Weber Pit 2 <br />Permit Action: Application for 112 Permit. Bond Calculation <br />Task Description: Redistribute stockpiled topsoil over pit floor <br />HOURLY EQUIPMENT LOST <br /> Basic Machine: Cat DBN Horsepower: 285 <br /> Blade Type: SEMI-UNIVERSAL ------- <br /> Attachment #1: ROPS Cab Shift Basi s: 1/day <br /> Attachment #2: 3-shank ripper -------- <br />Cost Breakdown: <br />------ Utilization X <br />Ownership tort/hr = f46.40 N/A <br />Operating 8 overhau l cost/hr- dozer = f51.67 100 <br /> -ripper = f0.00 0 <br />Operator cost/hr = f22.95 N/A <br />Total egpt. unit cost/hr = f121.02 Total fleet cost/hr : 5121.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 26.151.0 LCY Factor: N/A Volume: 26.151 .0 LCY <br />Source of quantity t ake-off: Assume 6 " depth over pit floor (32 .4 ac) <br />Source of est. swell factor: NA <br />HOURLY PRODUCTION <br /> diti <br />ti <br />J <br />b C <br />C F <br />t <br /> on <br />on <br />orrec <br />on <br />o ac <br />ors <br />Avg. push distance: 200 ft. ------------- - - <br /> ---- Operator.......... 0. 75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1. 10 (Cat tbl) <br />dozer production: 448 LCY/hr Dozing method..... 1. 00 (gen.) <br /> ------ Visibility........ 1. 00 (avg.) <br />Material consistency : Job efficiency.... 0. 83 (lsh/day) <br />Partly consolidated stockpile Spoil pile factor. 0. 70 (fnd-mf) <br />------ - di <br />P <br />h <br />t 1 00 (Cat tbl) <br /> us <br />gra <br />en <br />..... . <br />Avg. push gradient: 0.00 X (pos) Altitude deration. 1. 00 (Cat tbl) <br /> ---- Material weight... 1. 10 (Cat tbl) <br />Avg. site altitude: 7600 ft. Blade type........ 1. 00 (S.SU.U) <br />Material weight 2100.00 lb/LCY Net Job Correction 0. 52 <br />Mat. Descr.: ---- --- -- - <br />Earth - Loam Adjusted Unit Prod.: 235. 04 LCY/hr <br />------------- ------ <br />Adjusted Fleet Production: <br />235. <br />04 <br />LCY/hr <br />JOB COST --- --- -- <br />Fleet size 1 Dozers) Total Job Time: 111. 26 Hours <br />Unit Cost 50.515 /LLY Total Job Cost: f13 .465. 06 <br />