My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41030
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:50 PM
Creation date
11/20/2007 10:36:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
TAB 15 MR21 THROUGH 43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />Peabody M ~ 2~ <br />• PEABODY COAL COMPANY <br />Wr.storn Divl~lon <br />July 3, 1986 <br />• <br />Mr. Steve Renner <br />Hydrologist <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />a_ <br />RE: Request for Minor Revision No. 2~', C-005-80 <br />~r -c- <br />Dear ~~-n~ .-~• <br /> <br />1300 South vela <br />Flegstall, Arizona 86001 <br />(602) 774.5253 <br />As shown on the attached aerial photo, Seneca Mine is <br />currently stripping topsoil in advance of mining in the <br />Wolf Creek Area. The attached photo also shows the D9L <br />scraper pit area which is currently being graded. <br />Portions of the D9L area are ready for topsoil, In order <br />to maximize the direct haul and replacement of topsoil <br />from the Wolf Creek area to the D9L area. Peabody wishes <br />to reestablish a scraper road as shown on the photo. The <br />road will follow the alignment of a road which was <br />reclaimed in 1982. <br />Peabody proposes to blade the topsoil from the proposed <br />road in a windrow along the scraper road. The windrow of <br />topsoil will then be cover cropped using seed mix No. 4. <br />Topsoil would be transported from the Wolf Creek area to <br />the D9L area and immediately redistributed over regraded <br />spoil. When direct haul topsoiling is completed from the <br />Wolf Creek area to the D9L area (anticipated in Autumn, <br />1987), the scraper road will be scarified and the <br />windrowed topsoil will be redistributed. The scraper road <br />would then be revegetated in accordance with the approved <br />mine plan. <br />C~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.