Laserfiche WebLink
Area to be mined out. Reclamation will be a 5:1 slope with proper seeding, etc. <br />Area not mined. No reclamation is proposed on these areas. Any connecting rise <br />or rock face will be sloped to the mined out area with a slope no greater than <br />2:1. <br />. .. <br />Area not mined. Stockpiling area will be reseeded only, no slope work, topsoil <br />replacement or overburden replacement will be required as this area will not be <br />disturbed below ground level. <br />i <br />