My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40990
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:48 PM
Creation date
11/20/2007 10:35:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988037
IBM Index Class Name
Permit File
Doc Date
5/24/1988
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• r. The aiccc==;s road f.o the Shaffcer pi't is .^_0 feet wide a.nd is <br />desr_rihcd as follows: <br />"fhe centerline of the P-;:i.st-inc.l access r-'oad L-o this <br />pare.-o1 is described as follows: <br />Beginning at ~_~ point which bears Sa!rtl-i, li>6 feet from <br />the Wrst 1/4 Corner of ~=-aid Section 13; TI-~ence East 6-: <br />feet.; TI-~ence South 31 degrees 15 minutes, East, 1`i' feet; <br />Thence South 44 degrees ..^8 min!rtes E.a[-;t, 199 tact; <br />-thence hJor±:.h L~8 donrecas 9 min!rtes E~~isL, X63 feet; Thence <br />South ~ denree_; ST minutes EcwsL-, ._^i~ feet to the North <br />E'•n!rndary of the pareezl described in EXH1E'IT A. <br />The roacl i_, a rlra.vellc•d roaca and no improvemer~ts are planned <br />There are ttvn acce=..;s roads to the Havel<= pit, as delineated on <br />the map. L~nth roads a.lrea~!y e;:ist, and neither road needs to <br />be impro•/ecJ. No new roads arr• planned ~.it. t.his time. <br />E. No water will. he used in coni!~.ncl=ion wi{_h this operation. <br />9. P.lo ground nr sui°f ace w<.~ter will i:re encnunter'ed in this pit. <br />• 10. Not :~pplicahle. <br />11. -fhcx grave]. will be prncc~esed on si.to unless sold as pit run <br />in which c:a~-; c' ii: will not be prnressed a't all. In this pit, <br />there will he no asphalt mc::i.ng, no concrete plant, and n^ <br />washing of gravel. The only prnr_esscs will be crushing and <br />scrE'~ening. -the crushing plaint consists of a primary and a <br />soconda.ry crushing plant, sr_rr-Bening plant, ar~d conveyors <br />necessary for mov:ir-~g and stoc4::pi].ing the material. No <br />e'ho-am:ic<als will br--• !r;,ed in tl-,r--, procESS• therrfnre, the <br />natural. Hydrologic and ecologic balance nf, the area should <br />not be dist!rrbed. Bcr_Ca!lse no water nor chemicals are being <br />used, i:.her-'e sho!rld be no n''f-si.te cJisturhances or damage. <br /> <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.