My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40906
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:43 PM
Creation date
11/20/2007 10:33:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
5/23/2005
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be placed in the stockpile that will be established on the fan pad. In addition to the topsoil stockpiled from the <br />road extension, approximately 740 CY will be salvaged and stockpiled from the pad. The soil resources information <br />was derived from information presented in Exhibits 7 and 8, Soil Profile Description, and Soil Mapping Unit <br />Descriptions, respectively, and Map No. 19, Mine No. 3, Soils, presented in Permit C-84-062. These materials aze <br />incorporated herein by reference. <br />At the bleeder fan site, TCC will establish a test pit to verify topsoil depths prior to salvaging topsoil. The stockpiled <br />topsoil, which is located within the pad area, will be stabilized with the topsoil stockpile stabilizing seed mixture. <br />Prior to salvaging any topsoil from the site, a T&E species reconnaissance for Ute Lady's Tresses, Syiranthes <br />diuvialis will be conducted, and the results forwarded to the Division. It is not anticipated that this species will be <br />found, as the site appears to be outside of its natural range. <br />18 Rieht Ventilation Shaft (TR04-441 <br />Approximately 4,400 feet of the access road crosses upland areas, with the remaining 2,700 feet crossing lowland <br />areas where road construction will involve removal of any large vegetation and stripping and stockpiling of other <br />vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area. Given an average <br />topsoil depth of approximately b" in the upland area and a total road disturbance area of approximately 5.7 acres, <br />approximately 4,600 CY of topsoil will be salvaged from the road con•idor, and 2,000 CY from the 2.5 acre pad area. <br />Prior to initiating topsoil removal activities, stream/wetland buffer zones will be marked with identifying signs to <br />prevent surface disturbance within buffer zone areas. The topsoil from the road condor will be windrowed adjacent <br />to the road and topsoil from the pad area will be placed in a stockpile adjacent to the shaft pad and within the road <br />condor, for future reclamation use. The topsoil salvage volumes aze indicated on Table 49A. Seeding with the <br />topsoil stockpile stabilization seed mixture identified on page 2.05-121 will stabilize the windrowed and stockpiled <br />topsoil. <br />L J <br />• <br />TR 04-44 2.05 - 84.2 09/08/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.