Laserfiche WebLink
<br />... <br /> <br />20. If the nature of the deposit and the mining method used <br />will permit, describe tiie steps of phases of the mining <br />operation that allow concurrent reclamation. Include <br />a map or diagram, if necessary, and indicate a proposed <br />time schedule. See Section B <br />_~ <br />RECLAMATION PLAN: <br />21.. Describe the ultimate physical condition of the site and <br />specify proposed use (s), or potential uses, of the mined <br />lands as reclaimed. <br />The goal of reclamation at this site will be devoted to <br />creating usable pasture and or agricultural lands for <br />crop cultivation. <br />