My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40873
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40873
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:42 PM
Creation date
11/20/2007 10:32:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987074
IBM Index Class Name
Permit File
Doc Date
9/14/1987
Doc Name
DOTSERO BLOCK INC DOTSERO QUARRY MLRB FN M-87-074 ADEQUACY RESPONSE
From
ENVIRONMENT INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~II II~IIIIIIII~~ ~I~ M <br /> <br />Egviroqmeqt, Iqc. <br />LARRY E. O~BRIAN <br />~II!!IDlNT <br />September 11, 1987 <br />Ms. Patricia C. Martinek <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street Suite 423 <br />Denver, Colorado 80203 <br />Dear Ms. Martinek; <br />Re: Dotsero Block, Inc., Dotsero Quarry <br />NLRB File N0. M-87-074, Adequacy Response. <br />9989 WEST 80TH AVENUE <br />ARVADA COLORADO 80004 <br />Sb3-423-7297 <br /> <br />S f P 14 1987 <br />RECLA ~NED I,gND <br />NATION DIVISION <br />On behalf of our client Dotsero Block, Inc., we will respond <br />to the adequacy questions we discussed on September 10, 1987. <br />1. I understand your question about the organic material in the <br />topsoil and agree with you that there is possibly a deficiency <br />in the existing top soil. However I feel it is cost prohibitive <br />to import manure or other organic material at this time. The <br />remote location of the quarry makes this very cost prohibitive, <br />Dotsero will attempt to improve the organic content of the <br />topsoil by seeding the stockpiles with 4 lbs/a c. of Western <br />Wheatgrass if they are not to be disturbed for 1 year. <br />2. We inadvertently omitted explaining the 3 to 5 inches of <br />growth medium will be placed on 12 to 18 inches of cinder <br />material where bedrock will be exposed. This will give <br />additional root zone for plant establishment. <br />3. The slope from the original grade will be between 2h to lv and <br />3h to lv from the top of the existing slope to the bottom of <br />the mine. The nature of the cinder material dose not allow <br />terracing or benching of the slope. Reclamation of this <br />slope should not be any problem since the existing slopes are <br />in that general range. <br />4. At the current time there are 7.00 to 9.00 acres of disturbance <br />on the site. This is well with in the total allowable of <br />15.00 acres ± outlined in the bond needingresoiling. Reclamation <br />has commenced to reshape the area disturbed and not actively <br />being used for material storage or overburden storage. It is <br />
The URL can be used to link to this page
Your browser does not support the video tag.