My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40827
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:40 PM
Creation date
11/20/2007 10:31:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pages 4-222aa to 4-233r
Section_Exhibit Name
4.8 Hydrologic Impacts Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MacNamara Ditches. Trapper personnel have inquirad about tfie screening <br />~ interval Eor [his well. Unfortunately, neither the owner of the well (Mr. <br />Mack) nor the State District 6 Water Court have information on well depth, <br />water elevation or construction practices. The person who completed the well <br />(G.I. Buffham) was also contacted. To the best of his knowledge, the well was <br />completed in alluvial material. The driller was confident that the completion <br />zone was less than 400 feet. <br />In order for mining to impact the source of water Eor the well, the completion <br />zone must be at least 400 feet deep. One will not intercept the Third White <br />Sandstone at the well site at depths less than 400 feet. <br />Trapper Ftining Inc. will replace the water supply of any owner of a vested <br />water tight which is proximately injured as a result of the Trapper Mine. The <br />Twenty Mile Sandstone would probably be the aquifer which would be used to <br />replace the supply. <br />•` <br /> <br />4-2266 <br />R~111SED JAN 7 '88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.