Laserfiche WebLink
• i <br /> EXHIBIT L - RECLAMATION COST <br /> We have selected the phase of the mining that includes the largest area that will be disturbed at one <br /> time to calculate the potential reclamation liability for the Division of Minerals and Geology. This <br /> will occur toward the end of phase 1. It is anticipated that disturbances will total approximately 22 <br /> acres at that time. <br /> Activity Quantity Units Unit Cost Cost <br /> A. Stripped overburden and topsoil- <br /> approximately 22 acres of disturbance <br /> I. Replace overburden ?50,000� CY $0.70 $35,000 <br /> 2. Replace 12" of topsoil 10,500 CY $0.70 $7,350 <br /> 3. Seed and mulch 6.5 Acres $500 $3,250 <br /> B. Plantings 2 ! <br /> 1. Plant trees y// v/ ;/50 trees $250 $12,500 <br /> 2. Plant shrubs l/ �`� 200 shrubs $25 $5,000 <br /> Total of Disturbance Costs $63,100 <br /> Contractor Mobilization(10%) $6,310 <br /> Overhead(15%) $9,465 <br /> Administration (5%) $3,155 <br /> Total $82,030 <br /> Disturbed acreage -22 acres <br /> Financial warranty per acre - $3,729 <br /> 30.'73 <br /> u v V- ZZ <br /> S 3 <br /> 7ovlc7lc "'" l n, .r?� 1-iV /J< , a�ecu� <br /> -, f ,- ACC ' <br /> �.9 S� ,C.�: ��,--a�'�<,xz..r.-,� „�.�� :� ) G.s o�.cro� .z`a�c.�•�.a..:,��Y�.��:� /; <br /> 7. <br /> p2 <br /> NORTH LA POUDRE RESOURCE Page-39- <br />