r <br />• DIVISION OF MINERALS & GEOLOGY BOARD PERhIIT APPLICATION <br />REGULAR OPERATION (112) <br />PROJECT NAME: HOGUE/RIVER FIT <br />Pace 1 <br />EXHIBIT L - RECLAMATION COSTS <br />A. 'rhe reclamation of the project will be a continual operation <br />throughout the life of the mine. Removed overburden will be <br />hauled directly to backfill areas in areas exhausted of gravel <br />reserves. Initially, stripped topsoil will be utilized to <br />construct stockpiles along the north side of the pit. These <br />stockpiles are to satisfy the requirements of the RoutC County <br />Special Use Permit. Excess topsoil will be sold or transported <br />directly to areas being reclaimed. This will limit the amount <br />of topsoil to be stockpiled at any one time. The maximum <br />estimated amount of topsoil that would be stockpiled and <br />subject to be utilized for reclamation is estimated in Exhibit <br />D - Mine Plan, Section I. <br />i!sing the representation in Exhibit D, the maximum amount of <br />topsoil to be generated from this project is 47,660 BCY. <br />However, due to the creation of a pond, topsoil will only he <br />• .required to be replaced around the perimeter of the pond. <br />Topsoil replacement quantities are based upon the length of the <br />outside perimeters of proposed shoreline in each phase. A 50 <br />feet width is used to evaluate quantities. Existing shorelines <br />located in Phase I are not considered for topsoil replacement. <br />However, additional topsoil quantities are included in Phase I. <br />'Phe additional 4,600 cubic yards is included for intangible <br />areas in all phases and will not necessarily be required. <br />PROPOSED TOPSOIL ADDITIONAL REQUIRED TOTAL <br />;?HASE SHORELINE BCY OTY QTY CY FOR RECLAM <br />I 1,300' 2,410 4,600 7,OI0 <br />II 500' 950 950 <br />III 2,300' 4,260 4,260 <br />IV 1,500' 2,750 2,730 <br />'T'OTALS 5,600' 10,400 4,600 15,000 <br />----- ------ ----- ------ <br />----- ------ ----- ------ <br />'T'he maximum estimated amount of shoreline that would be exposed <br />to mining operations and subject to reclamation during any <br />phase of operations is anticipated to not exceed 2,500 LF. <br />'Phis would include project completion or the area prior to <br />completion of all phases. It is determined, by using previous <br />. calculations, that this would require 4,630 CY of topsoil. <br />Phis is calculated as: <br />?,500 LF shoreline X 50 feet (wide) X 12 inches (depth of <br />topsoil) = 125,000 SF (of topsoil) / 27 4.630 CY of topsoil <br />subject to replacement. <br />Duckels Construction, Inc. dba Yampa Aggregates <br />41230 Routt County Rd. #129, Steamboat Springs, Colorado 30487 <br />