Laserfiche WebLink
4. (Unless otherwise noted, the information relative to the subsets of this section <br />is found in the attached documents.) <br />4.2 The crest of the western embankments is designed to accommodate <br />equipment access for dewatering and periodic sediment removal. <br />4.3 Dewatering of the detention pond is proposed employing portable <br />pumping equipment rated to accommodate dewatering within the 72- <br />hourcriterion. <br />Please contact me should you have questions or comments. <br />Sincerely, <br />1~--~ <br />Matt Carnahan <br />ConsultanU Agent for Gravel, LLC <br />Encl. <br />Xc: w/allachmenls, Kate Pickforc~'DMG, DGO <br />D. Simonson ,Gravel, LLC <br />Matt Carnahan - 15 W. Mill Street, Ste 214 - P O Box 1951 - Bayfield, Colorado 81122 <br />(970) 759-5463 Fax: (970) 884-5062 <br />2 <br />