Laserfiche WebLink
•latNti-tAL ; ~_: ::..~ !.^:~ C:Uf4Jl l IUNb: (11~,YGRIfeK i! HF-AU I I tMS) P,rvu cr <br />1. This permit is issued I:. reliance upon the accuracy and completeness of information <br />supplied by the applicant and is conditioned upon construction, installation and operation <br />.:. uCCJ..;u..w ~r liiii ifi1S ~n+[/f i+mlivi+ ci IiJ W I iri I'epi cx~ ~~ouvi ~a inuGC'. by is+C cN f. i:i,c: i i :' Itf. <br />agent;. - <br />2. This permit Is tizlid only for the equipment and operations specifically identified herein. <br />3. Each 2nd e~~er; condition of this permit is a material part hereof and is noT severable. Any <br />challenge to, or appeal of, a condition hereof shall constitute a rejection of the entire permit . <br />and upon such occi,rrence this permit shall be deemed dsnied ab initio. <br />4. _ This permit maybe revoked at any time prior to final approval by the Air Pollution Control <br />Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and <br />regulations of the Air Quality Control Commission (AQCC), including failure to meet any <br />express term or condition of the permit <br />_ _ 5. This permit must be retained and made available for inspection upon request at the <br />- - - Tcatio`n seTfo~i ~i Y~er~i-nTeSp~ctYO~~ortabie~ovrce which is moved to anew- -- - - -- <br />location, acopy of the revised Airi'ollutant Emissions Notice (APEN) (required by law to <br />be submitted to the APCD whenever a portable source is relocated) should be attached to <br />this permit. The permit may be reissued to a new owner as provided in Section III.B. of <br />AQCC Regulation No. 3 upon transfer of ownership. <br />6. Initial approval of an emission permitdoes not provide"final"authority foroperation ofthis <br />• source. Final approval of the permit must be secured from the APCD in writing in <br />accordance with the provisions of C.R.S. 1973, Section 25-7-114(4)Q) and Section IV.H. of <br />AQCC Regulation No. 3. Final approval cannot be granted until construction iscompleted <br />and operation and constructior, have been verified by the APCD as conforming' in all <br />respects with the conditions of the initial approval permit. . <br />7. You MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to <br />commencement of the permitted operation or activity. Failure to do so is a violation of <br />C.R.S.1973, Section 25-7-114(4)(j) and Regulation No. 3., Section IV.H.1., and can result in <br />the revocation of the initial approval permit <br />8. You MUST obtain final approval within six months of the commencement of operation as <br />that term is defined by the AQCC. Failure to obtain final approval will result in the <br />revocation of the initial approval permit. <br />9. If the APCD determines that the terms and conditions of the initial approval permit have <br />been satisfied, the APCD will issue a final approval permit, which does constitute "final" <br />authority to operate as discussed in Paragraph 6 above. <br />10. Violation of the terms of a final approval permit or of the provisions of the Colorado Air <br />Quality Control Act or the regulations of the AQCC may result in administrative, civil or <br />criminal enforcement actions under C.R.S. 1973, Sections 25-7-115 (enforcement), 25-7- <br />121 (injunctions), 25-7-122 (civil penalties) and 25-1-114 (criminal penalties). <br />11. Unless specifically stated otherwise, the general and special conditions contained in - <br />this permit have been determined by the APCD to be necessary to assure compliance <br />• with the provisions of C.R.S. 1973, 25-7-114(4)(8) and, as such, shall be enforceable <br />underthe provisions of C.R.5.1973, 25-7-1 i5 afterfinal approval ofthe permit has been <br />granted. - - - - <br />~ - - <br />