Laserfiche WebLink
• iii iimiiiiiiii-iii <br />999 <br />PINE JUNCTION - <br />Pre-mining and mining plan map - <br />Enclosed is an aerial photo showing the pit sites, stockpile <br />area and proposed crushing site in red. This site had no re- <br />useable material for topsoil so at completion of pit operation <br />topsoil will be hauled in for partial reclamation. This site <br />will be a small shoppette or office space building. Those areas <br />not affected by building site will be replanted with crested <br />wheat grass mixed with an intermediate wheat grass at the owners <br />discretion. <br />Water information - <br />Water for dust control of the pit site will be hauled in by <br />tanker from a metered source; this also includes water for <br />Chem-Jet spray bars on crusher. This pit is not active so crush- <br />ing phase operation at this time is just proposed. <br />On site water at this time - <br />None on site, however, owners have underground well permit <br />which expires January 1, 1979. This indicates the possibility <br />of a well being drilled. This will not interfere with the <br />extraction of gravel from this site. <br />