My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40520
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:26 PM
Creation date
11/20/2007 10:22:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
6/13/2002
Doc Name
Letter & Application
Section_Exhibit Name
Appendix W 2001 Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRdPPBR 1~~NtNG tNC. <br />Mazch 13,2002 <br />Ms. Janet Binns <br />Colorado Division of Minerals and Geology <br />1313 Shemran St., Room 215 <br />Denver, CO 80203 <br />Deaz Janet: <br />Subject: Trapper Mine (Permit No. C-81-010) Technical RevLcion TR-90 <br />2001 Annual Report, Appendiz W <br />Trapper Mine's Annual Report for 2001 is composed of seven sections. Section 1.0 reports 2001 <br />reclamation activity as specified in Section 2.04.13 of the Colorado Mined Land Reclamation Boazd <br />Regulations for Coal Mining. All appropriate maps aze enclosed. <br />Section 2.0 is the Annual Hydrology Report and is composed of eight subsections. <br />2.1 Climatological Data <br />2.2 Pit Dewatering and Consumptive Water Use for 2001 <br />2.3 Mining Advancement and Ash Disposal <br />2.4 Monitoring Points <br />2.5 Hydrological Data (Hydro-Engineering Inc. report) <br />2.6 Hydrological Trends <br />2.7 Spoil Spring Sampling <br />2.8 WET Testing Results <br />Section 3.0 is a report on Trapper's drainage reconstruction efforts 1987-2001. It consists of a narrative <br />segment describing our reconstruction methods and results as well as a map showing the locations of <br />our drainage reconstruction efforts minewide. In 2001, approximately 2,500 feet of drainage <br />construction work was performed in the Oak, West Flume and East Middle Flume drainages. Drainage <br />repair work was completed on approximately 1,2001ineaz feet of the Johnson, No-Name and Oak <br />drainageways during the 2001 field season. <br />Section 4.0 is the recontoured spoil sampling section. Spoil sampling requirements were discontinued <br />in 2001. In future years, this section of the Annual Report will be omitted. <br />Section 5.0 is a narrative and trap showing topsoil stockpiles constructed in 2001 and proposed 2002 <br />topsoil stockpile locations. Additionally, the map has been updated to show all existing topsoil <br />stockpiles minewide with appropriate identification numbers. The narrative and accompanying Table <br />5-1 describes topsoil stockpile locations, size and approximate volumes. <br />Section 6.0 is the stock tank and dozer basin section. This section contains a narrative and a trap of <br />stock tank and dozer basin locations. Table 6-1 reflects the revised as-built stock tank density. <br />P.O. Box 187 Craig, Colorado 81626 (970) 824-4401 <br />
The URL can be used to link to this page
Your browser does not support the video tag.