Laserfiche WebLink
TABLE OF CONTENTS <br />TAB 12 <br />FACILITIES <br />Page <br /> Introduction 1 <br /> Sediment and Water Control Facilities Plan 1 <br /> Truck Loop Pond 2 <br /> Rail Loop Pond 2 <br /> Shull Area Exemptions 3 <br /> Topsoil Stockpile 3 <br /> Substation 3 <br /> Office/Parking Lot/Leach Field 4 <br /> Railroad Loop 4 <br /> Areas 1 and 2 4 <br /> Diversion Ditches 5 <br /> Transportation Facilities 5 <br /> Haulage Roads 5 <br /> Access Roads <br />ht-U <br />R <br />Li <br />d 8 <br />8 <br /> se <br />oa <br />g <br />s <br /> Railroad Spur 8 <br /> Support Facilities (2,000,000 Ton Train Unloading and Truck Loading System) 11 <br /> Railcar Unloading Facility 14 <br /> Reclaim Tunnel and Conveyor 14 <br /> Radial Stacker 14 <br /> Coal Storage ld <br /> Dump Hopper Facility 14 <br /> Crusher Building 14 <br /> Truck Loadout Building 15 <br /> Operation 15 <br /> Ancillary Facilities 15 <br /> Sewage Water and Stormwater Facilities 15 <br /> Power Transmission 15 <br />LIST OF FIGURES <br />Fig re Pie <br />12-1 Typical Sections for Haul Roads (H-G Coal Company) 9 <br />12-4 Profile and Section for Railroad Spur (H-G Coal Company) 10 <br />TR-06 i Revised 05/05 <br />