Laserfiche WebLink
Colorado Division of Miners le and Geology <br />ESTIMATING FORM - SCRAPER YORK <br />TASK N0. 2 PREP. BY: GRS PERMIT N0. M-%-082 <br />DATE : 01/06/97 FILENAME: N082-2 MINE: Blair Nese <br />PERMIT ACTION Nay permit <br />TASK DESCRIPTION Spreed topsoil J^-- <br />HOURLY EQUIPMENT COSTS: <br />______________________ Sina le, Double or Triple <br />County: R10 BLANCO Labor Zone 2 Shifts S <br />---4---- Equipment Descriptforre <br />Scraper teem make-up CAT 637E yith RODS cab <br />Road main[. - Grader N/A <br />- Yater T.: N/A <br />Scraper Team <br />Scraper Dozers) <br />Equipnant Filerume:637E-ROP 0 <br />Utilization on job: 100X N/A <br />Cost Breekdoyn: ~~ <br />peierehip coat/hr: 567.47 N/A <br />Operating cost/hr: 5128.59 N/A <br />Operator cost/hr: f23. 13 N/A <br />Unit subtotals: 5219.20 N/A <br />Scraper team subtotal f438.39 <br />Total York Teem Cost/Nr: (438.39 <br />IUTERIAL QUANTITIES: <br />Beg. <br />volume: t66n ccr <br />Cu.Td. --------- Swell <br />Vo luny!: 16,617 CCY Factor: <br />Road Metntenerce <br />Grader Yater truck <br />N/A N/A <br />N/A N/A <br />M/A N/A <br />N/A M/A <br />M/A N/A <br />N/A M/A <br />Y <br />Mein[. subtotal N/A <br />Loose <br />1.125 Volume: 18,694 LCY <br />Source of quantity take-off: Ne <br />Source of est. swell factor: Na <br />