Laserfiche WebLink
<br />RECLAMATION COST Sl1NART canted sheet 4 of 4 <br />K. PORTAL/SHAFT SEAIIMG <br />Task No.~ Task Description ~ Coat (f) <br />Subtotal (K): <br />eeeeveeeevve <br />L. DRILL HOLE/IIONIiORING YELL SEALING <br />Tesk No.~ Task Description ~ Coat (f) <br />Subtotal (U: <br />cevveeevveve <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Tesk No.~ Task Description ~ Coat (f) <br />y <br />Demolition <br />3 ~ Seedirq ~ f8,422 <br />Fencirp <br />4 ~ Mab/Demob ~ 51,250 <br />Subtotal (M): 59,672 <br />TOTAL DIRECT RECLAMATION LOSTS {subtotals A through M):e f27, 859 <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />)ten No.~ Item Description ~ Coat (f) <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ f432 <br />2. ~ Contractor's Performarxe Bond 0.975% of dir. ~ !272 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f2, 786 <br />4. ~ Jab Superi ntandent.. <br />Subtotal (A): !3,489 <br />------------ <br />TOTAL CpISTRUCTION CONTRACT AMOUNT (di rest plus 0 8 P); (31,348 <br />___ _____ __ <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item Mo.~ Item Description ~ Coat (S) <br />1. ~ Minerals Program Admin. Fee at 5.00% of cnt r.~ !1,567 <br />MET INDIRECT COST PERCENTAGE: 18.15% Subtotal (8): f1,56T <br />TOTAL INDIRECT RECLAMATIp( COSTS (subtotals A through B); 55,057 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect coats): (32,916 <br />cave--eve <br /> <br />