Laserfiche WebLink
<br /> <br />-6- <br />Location in A lication <br />INFORMATION CATEGORY NARRATIVE MAPS <br />2.05.3(4) Ponds, Impoundments and <br />Diversions <br />2.05.3(5) Topsoil (removal and <br />storage) NA <br />2.05.3(6) Overburden <br /> NA <br />2.05.3(7) Coal Handling Structures <br /> NA <br />2.05.3(8) Coal Processing Waste and <br />Non-Coal Processing Waste NA <br />2.05.3(9) Underground Development <br />Waste NA <br />2.05.3(10) Return of Coal Processing <br />Waste to Abandoned NA <br />Workings <br />2.05.4 Reclamation Plan NA <br />2.05.4(2)(a) Timetables <br /> NA <br />2.05.4(2)(b) Reclamation Cost Estimates) <br /> NA <br />2.05.4(2)(c) Backfilling and Grading *Post-mining <br /> NA topography - <br /> 2.05.4(2)(c) <br />2.05.4(2)(d) Topsoil (Redistribution) <br /> NA <br />2.05.4(2)(e) Revegetation <br /> NA <br />2.05.4(2)(f) Disposal of Debris, Acid- <br />Forming and Toxic-Forming NA <br />Materials <br /> <br />