My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40235
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:14 PM
Creation date
11/20/2007 10:14:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006084
IBM Index Class Name
Permit File
Doc Date
5/15/2007
Doc Name
Initial Reclamation Liability Estimate
From
DRMS
To
Greg Lewicki and Associates
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PUMPING WORK <br />PROJECT IDENTIFICATION <br />Task no.: 01a State :Colorado PermiUjob no.:M-2006-084 <br />Date <br />User <br />05/15/2007 <br />GRM <br />Abbreviation :none <br />Filename :M084-01a <br />Agency or organization nameDRMS <br />Permit or other job action :Initial Reclamation Lia <br />Task description :pump down pit for <br />Estimate <br />~e establishment <br />HOURLY EQUIPMENT COST <br /> <br />Description Quantity Data <br />Source <br />Pump : Centrifugal pump - 125M, 8 in. 2 (CRG) <br />Suction hose : Suction pipe - 8 in. diam., 25 ft. 2 (CRG) <br />Discharge hose : Discharge pipe - 8 in. D., 25 ft. 2 (CRG) <br />Labor: NA 0 NA <br />Cost Breakdown <br />Ownership cosUhour <br />Operating cosUhour <br />Operator cosUhour <br />TotalcosUhour <br />County :Rio Blanco <br />Site :White River Citv Pit <br />Job Utilization <br />$9.04 NA <br />$29.16 100 <br />$0.00 NA <br />$38.20 <br />Job shift basis : 3 per day <br />Horsepower: 70 <br />Weight (UST) : 1.50 <br />Total fleet cosUhour : $38.20 <br />.:- .. <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume: 139,932,000.00 gallons factor: 1.0000 volume: 139,932,000 gallons <br />Total pond inflow surface Unit inflow rate in Total pond inflow volume <br />area : 120,000 sq. ft. gph/sq. ft.: 0.1758 per hour : 21,096.00 gph <br />Source of volume estimate :23.92 acre pond X 18 foot <br />PUMPING TIME <br />Maximum pump capacity : 70 gph/pump Adjusted pumping capacity : 252,000 gph <br />Estimated suction head : f0 feet Initial unadjusted pumping time 555.29 hours <br />Estimated discharge head : 20 feet Inflow during initial pumping : 11,714,307 gallons <br />Total head : 30 feet Net unadjusted pumping time : 601.77 hours <br />CPB pump capacity : 126,000 gph/pump Altitude adjustment factor : 1.0638 (3% rule) <br />Site altitude : 5,700 feet Pump efficiency factor : 1.0909 (55 min./hr.) <br />Inflow as % of pond volume : NA % Total adjusted pumping time : 698.37 hours <br />JOB TIME AND COST <br />Unit cost : $0.000176 per gallon <br />Total job time <br />Total job cost <br />698.37 hours <br />$26,679 <br />
The URL can be used to link to this page
Your browser does not support the video tag.