Laserfiche WebLink
U <br /> <br />W a[er collected within the pit will also be used for dust control within the project site. This could <br />amount to as much as 7,000 gallons per day. <br />Water for landscape reclamation along G and 23 Road will be required for the drip irrigation system. <br />This could amount to 260 gallons per day during the spring, summer and fall months, and will be <br />supplied from an existing water main located adjacent to the project site. <br />No irrigated water source will be requred for reclamation on the site. Tall Wheatgrass will be planted <br />during the wet spring or fall planting seasons. Natural moisture will be used to establish and maintain <br />the vegetation. <br />5) The operator shall aj~rmativety state that the operator has acquired (or has applied for) a National <br />Poilutan! Discharge Elimination System (NPDES) permit from the Water Quality Control Division at <br />the Coiorada Department of Health, if necessary. <br />The operator will obtain all necessary NPDES permits prior to any sand and gravel mining work. <br />