My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40162
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:11 PM
Creation date
11/20/2007 10:11:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 43 Original WEM Site Construction Specifications & Drawings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />SECTION 01010 -SCOPE OF WORK <br />PART1-GENERAL <br />1.01 Project Description <br />This project consists of constructing certain surface facilities which are necessary <br />for the development of the ARCO - Mt. Gunnison No. 1 coal mine. <br />These surface facilities are those which in some way are related to earthwork. <br />These include ponds, roads, buried pipelines, channels, ditches, retaining walls, <br />building pads, parking areas, driveways and embankments. <br />The earthwork project is broken down into the following categories. Note that <br />each category has its own project number. <br />Project No. MG-02-00 General Site Preparation <br />Includes grading of pads for future construction, short roads that lead from <br />the main access road, drainage ditches across the site, retaining walls, <br />general grading, storm drainage pipes and culverts. <br />~• <br />Project No. MG-02-O1 <br />Project No. MG-02-02 <br />Project No. MG-02-03 <br />Project No. MG-02-04 <br />Runoff Pond No. 1 (MS-1) <br />Runoff Pond No. 2 M13-2 <br />Runoff Pond No. 3 MB-3 <br />Freshwater Pond FW-1 <br />The pond projects involve the construction of earth embankment dams and <br />all required appurtenances. These projects have their own specification <br />packages which will govern the construction of these items. However, the <br />cost of these items will be included in the total bid for the Earthwork and <br />Utilities Package. <br />Project No. MG-02-11 Access Road <br />This project entails the construction of approximately 1,000 L.F. of new, <br />temporary access road; 900 L.F. of temporary access road upgrading and <br />7,200 L.F. of permanent access road. <br />Certain waterlines, sewer lines, and storm drainage lines are to be con- <br />structed in conjunction with the access road, and are consequently made a <br />part of this project. <br />Steel bin-wall retaining walls, guard rails, asphalt paving and miscellaneous <br />appurtenances are also included in this project. <br />Project No. MG-02-13 Railroad Embankment <br />This project involves the construction of a railroad embankment on the north <br />• side of the North Fork of the Gunnison River, including cuts, fills, retaining <br />walls, storm drainage culverts, and final grading. (This project does not <br />include any ballast, or trackage.) <br />01010-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.