Laserfiche WebLink
VOLUME II-E <br />\J <br />• <br />L <br />LIST OF EXHIBITS <br />42A EMD Alluvial Valley Floor Determination <br />43 U,S. Fish and Wildlife Service: Windy Gap Process <br />44 NPDES Permit CO-0042161 <br />45 Fish Creek AV S/Stream Study: Hydrologic Analysis (Confidential Appendix) <br />46 Fish Creek AVS/Stream Study: Vegetation Analysis <br />47 Ownership and Control Information Update <br />47A Prior Affiliation History for Nicholas P. Moros, Vice President <br />47B Prior Affiliation History for Garold R. Spindler, Senior Vice President <br />47C Prior Affiliation History for Susan E. Chetlin, Assistant Secretary <br />47D Prior Affiliation History for Kevin S. Crutchfield, Senior Vice President, Midwest Region <br />47E Prior Affiliation History for Thomas V. Falkie, Duector <br />47F Prior Affiliation History for Pat Panzarino, VP, Sales & Marketing <br />48 Haul Road for Batchway <br />48-1 Batch Weigh Loadout Haul Road, Alternative Gravel Section/Construction Recommendations <br />48-2 Batch Weigh Loadout Hau] Road, Modified Gravel Section/Construction Recommendations <br />48-3 Main Entrance Road and Parking Lot, Pavement Recommendations <br />49A 6-North Mains Intake Shaft -Design Drawings <br />49B Bathhouse Expansion Design Drawings <br />49C 18-Right Escape Hoist Foundation Drawings <br />49D Conveyor Support Structure and Foundation Drawings <br />MROS-199 <br />xi <br />09/13/05 <br />