Laserfiche WebLink
Scrrivn - 2.05.3 <br />G. associated catch bench will be constructed so that they slope into the hill at 15 <br />percent and 30 percent, respectively, both to control drainage and to catch and retain <br />loose rock from above. <br />Road construction methods are similar for all classes of roads, with construction generally involving <br />initial clearing of vegetation and recovery of available soil materials, cut-fill excavation and placement, <br />'I'R-41 2.05-316 Revised Auv 2002 <br />