Laserfiche WebLink
<br /> <br />12/26/79 Memo, p. 4, #4(a)(7) <br /> <br />"7. Refer to 780-13. Further explanation of the dozer <br />pits is required for example, where is the material <br />from the first cut placed and what is the amount of <br />swell associated with this type of mining." <br />See pp. 780-13(a) and (b) <br />12/26/79 Memo, p. 4, #4(a)(8) <br />"8. Refer to 780-15. In paragraph 4 it states that no <br />more than 4 spoil ridges will be in place at one time. <br />This conflicts with prior statements advising that six <br />ridges are required to fill final cuts. This should be <br />clarified." <br />See p. 780-112(a) <br />12/26/79 Memo, p. 4, #4(a)(9) <br />"9. Refer to 780-28. Applicant states that all the <br />ponds have liners. However, inspection of the site <br />reveals that only one pond has a liner. The other two <br />ponds will need to be reconstructed." <br />See p. 780-28(a) <br />12/26/79 Memo, p. 4, #4(a)(10 <br />"10. Refer to page 780-38. The lab facility is not <br />included as a pre-existing structure. Please clarify." <br />See pp. 780-351a), 780-36(a) <br />12/26/79 Memo, p. 4, #4(a)(11) <br />"11. Refer to page 780-41. <br />indicate what decision was <br />power lines." <br />The applicant should <br />reached on construction of <br />See p. 780-41(a) <br />