Laserfiche WebLink
..: !^:~: <br />rification <br />~{ <br />'., l <br />";sl <br />-i <br />~t+ <br />-5- <br />„-..L with "U" glade and double shanked ripper <br />2400 ft2/pass <br />Speed: 1 ~nph <br />6 ft. centers, 200' pass length <br />Cycle tune: 4.55 minutes <br />Factors . <br />.75 (Avg. operator) <br />.84 (Efficiency) <br />(60 min/hr) (4.55 min/cycle) x (2400 ft2/cycle) <br />x (.75) x (. 84) <br />= 19,900 ft2/hr <br />_ .46 acres/hr <br />Time = 2U hours <br />Cost Estimate <br />Conveyor Structure Kenioval <br />350 if @ $11.47/lf <br />Debris Removal <br />L-F- 3a ~~ <br />11 dump trucks ld $43.71/hr. and <br />1 front-end loader la $37.54/irr. for 34 hours <br />Wages <br />408 hours @ $15.00/h r. <br />Backfilling and Grading <br />U-8L 164 hrs. @ $79.64/hr. <br />Wages <br />164 hrs. @ $15.00/h r. <br />Final Grading <br />U-BL 33 hrs. (d $79.64/hr. <br />Wages <br />33 hrs. ld $15.00/h r. <br />Topsoil Replacement <br />627 B 73 hrs. @ $127.00/hr. <br />Wages <br />73 hrs. @ $30.00/h r. <br />$ 4,014.00 <br /> <br />$17,623.00 <br />$ 6,120.00 <br />$13,061.00 <br />$ 2,460.00 <br />$ 2,628.00 <br />$ 495. U0 <br />$ 9,271.00 <br />$ 2,190.00 <br />