Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES <br />D Mnnre Pascoe. E.ecm me Du xlpr <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON Director <br />Rirnaro D Lamm <br />Governor <br />.~ <br />May 4, 1933 <br />TO <br />FRUM: <br />RE: <br />Terror Creek Fi]e <br />Uan I~lathews <br />Bond Calculation for Terror Creek Loadout <br />File No. C-059-83 <br />Reclamation cost projections contained within the application have been <br />revised, in some cases, by the Uivision. Tha major changes between the <br />applicant's assumptions and the Division's assumptions are summarized below: <br />' 1. Pad area reclamation - Average dozer push distance. ~r^"' ~d Zt^- <br />Applicant: 100' Division: 150' /~v ' z~j~ 4,, 4; (( <br />2. Topsoil replacement <br />Applicant: 5700 yd3 Division: 11,000 yd3 <br />3. 627 B Scraper pair rental rate <br />Applicant: $97.37/hr. Uivision: $127.00/hr. <br />4. Operator wages <br />Applicant: IJOt included Division: $15.00/hr. <br />5. Site cleanup (haul off coal stockpile base material) <br />Applicant: Not included Division: 2,807 yd3 of material <br />hauled to Uelta County <br />Landfill. <br />6. Coal conveyiny and crushing facilities removal <br />Applicant: Not included Division: $4,041.U0 <br />423 Centenm al Building. 1313 Sharman Street Derrvpr. Oolnra~l~ 307n3 Tai t'+.??t nhr;.zSa; <br />