My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13404
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:40 PM
Creation date
11/19/2007 2:41:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Application Correspondence
Doc Date
11/5/1996
Doc Name
ADDITIONAL GEOTECHNICAL STUDY EVALUATION OF THE STABILITY OF THE RECLAIMED SLOPES BOWIE 2 MINE BOWIE
From
DMG
To
DAVE BERRY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ .. <br />.; <br />• <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman 51., Room ? 15 <br />Denver, Colorado 80203 <br />Phone: 1303) N66-3567 <br />fA%: (3031 832-8106 <br />DATE: November 5, 1996 <br />~ III Illllllllllll III <br />~~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />T0: Dave Berry RooyR nomer <br />lames 5. Loc hhead <br />Executire D:'PCIO! <br />FROM: Jim Pendleton mi~haels E°ng <br />Division Dnedor <br />RE: "Additional Geot nical Study, Evaluation of the <br />Stability of the Reclaimed Slopes, Bowie No. 2 Mine, <br />Bowie, Delta County, Colorado" <br />(Permit No: C-96-083) <br />I have reviewed the above referenced additional geotechnical study, which you <br />forwarded to my attention. This study was prepared by MAXIM Technologies, <br />Inc., a geotechnical subcontractor to Morrison Knudsen, the primary design <br />contractor for Addington Resources. This study was prepared to address <br />adequacy comments included in my review memorandum addressing the original <br />Maxim Technologies Geotechnical study, dated August 4, 1996. This study was <br />submitted by J. E. Stover & Associates, the permit consultant for the Bowie No. <br />2 Mine. As I understand the situation, Jim Stover desires our opinion concerning <br />this additional geotechnical study, which he anticipates will satisfy certain of <br />my earlier adequacy concerns. <br />General Comment <br />The Maxim Technologies additional geotechnical study evaluates one specific <br />aspect of my geotechnical adequacy concerns. It addresses the stability of <br />reclaimed bench cuts backfilled with on-site materials. It provides the results <br />of a one-hole boring program, including laboratory characterization of the soils <br />and bedrock encountered in that additional boring. It includes analyses of two <br />of the highest cuts proposed at the site, that of the stockpile bench and the <br />portal bench. It provides general recommendations for the design of <br />reclamation fills at the Bowie No. 2 Mine, based on these general analyses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.