Laserfiche WebLink
<br /> <br />Mr. Darry Ferguson -3- February 18, 1993 <br />1. Division Ditch No. 1 - since the gravel pit will mine <br />through this ditch, it must be relocated and redesigned for <br />the appropriate storm event. <br />2. Verify that the East Collection Ditch can handle any <br />additional runoff associated with the 33 acres of new <br />disturbance from the gravel pit operations, if any. <br />3. Portions of the West Collection Channel are within the <br />boundaries of the gravel pit operations and may be <br />disturbed. Additionally, portions of the 33 acres to be <br />disturbed will flow into the ditch, therefore, the ditch <br />designs will have to be reevaluated and the ditch changed as <br />necessary. <br />4. The permanent channel realignment will have to be redesigned <br />for the 3.75 inch 100 year event. <br />5. The Division cannot find the calculations to derive flow for <br />30.0 cfs and 43.75 cfs for the West Fill and East Fill <br />Downdrains. Please provide this information and update if <br />necessary. <br />6. verify that Sediment Pond No. 2's emergency spillway can <br />safety pass the 25 year event storm of 2.80 inches and that <br />there will still be one foot of freeboard above level of the <br />increased flow. If not, please submit new designs. <br />7. Since Pond 1 will receive an additional 33 acres of <br />disturbed flow from the gravel pit operations, and due to <br />the changes in the event storms, please recalculate all <br />design parameters for Pond 1. Additionally, according to <br />the Pond 1 as built drawings, the north end of the pond has <br />an elevation o 6790.2 and the elevation of the emergency <br />spillway rock channel is 6789.5 Even without water flowing, <br />there is not 1 foot of freeboard above the emergency <br />spillway as required by the regulations. Please address <br />this matter as well during the redesign of Pond 1. The <br />Division is aware that once the pit becomes operational, <br />that water to the pond will be controlled by pumps, however, <br />until the pit is actually retaining water the pond must <br />completely contain the 10 year event and safely pass the 25 <br />year event with 1 foot of freeboard above the 25 year event <br />level. <br />8. The sediment control map does not adequately show how water <br />flowing off of the explosives pad reaches pond 2. Please <br />clarify this. <br />