My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13351
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:38 PM
Creation date
11/19/2007 2:40:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
Application Correspondence
Doc Date
3/3/1986
Doc Name
BLUE FLAME ADEQUACY REVIEW REGARDING SURFACE DRAINAGE
From
MLRD
To
PETER O CONNOR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Richartl D. Lamm <br />Governor <br />DATE <br />70: <br />III IIIIIIIIIIIII III <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getches. Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />March 3, 1986 <br />Peter O'Connor <br />FROM; Anne Baldrige ~ ~/ <br />RE: BLUE FLAME - ADEQUACY REVIEW REGARDING SURFACE DRAINAGE <br />I have completed my review of the proposed drainage control system for this <br />mine. Following are my comments. <br />1. The design for the propoed pond is adequate, however, the pond is <br />circular and would be difficult to build. I suggest building a square pond <br />with the same depth and side slopes. The surface dimensions should be 50' x <br />50' with inside bottom dimensions of 46' x 46'. <br />2. The pond design does not include a principal or emergency spillway. A <br />principal spillway is not necessary for this small pond as long as the <br />operator commits to pumping the pond to maintain enough storage for the 10 <br />year - 24 hour storm. <br />The pond should have an emergency spillway. This spillway must be designed tc <br />pass the peak flows from the 25 year - 24 hour storm event. Using the <br />criteria established for the 10 year - 24 hour storm the design is as follows. <br />L = 320 ft. <br />Z=100 ft. <br />5=31% <br />A = 1.9 acres <br />Rainfall = 2.5" <br />CN=81 <br />Runoff = 0.94" <br />No shape adjustment <br />Slope Adjustment = 1.09 <br />Q 25 years = (1.09)(4.83 CFS/in)(0.94") <br />Spillway Design: <br />n <br />i~ ~ t <br />I`- ~ --~I <br />= 4.95 CFS <br />determine L using <br />broad-crested weir: <br />Q = CLH 3/2 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.