Laserfiche WebLink
<br /> <br />-2- <br /> <br />The applicant should submit a revised map which shows the location of <br />all monitoring wells to be used in the proposed ground water nnnitoring <br />program. Currently, Map 9 does not show the location of the Fish Creek <br />Rule 2.04.7(4) (b) <br />Rule 2.04.7(4) (f) 0~ o`~• S~a~tl~ 6. <br />` 71.cā€ž ~n,C. <br />Map 9 shows a "Dewatering We11" in the southeast corner of Section 29. <br />The applicant should provide a description regarding the proposed <br />function of this well. It is assumed that this well is completed in the <br />reclaimed spoils aquifer and will be used to intercept spoils water before <br />it reaches the proposed portal area. If this is the case, the applicant <br />should provide an estimate of expected pumping rates, expected water J~ <br />quality, and a description of how the water will be handled and where ~ s <br />discharge will occur. The probable hydrologic cronsequences of the discharge <br />of this water should also be analyzed. 9~a ~ <br />C a, <br />0 <br />Rule 2.05.6(3) (b) (iii) ~,\ ~a~~i~ , <br />aquifer wells, well 001-5-10, and well 006-82-38. <br />C ~o-t.C_ ~ dom... fi. 'Ati ~ -~,1~ i <br />Table 8 should be nodified to include the appropriate well data for the <br />Fish Creek alluvial aquifer wells. <br />The applicant should submit a proposal to monitor water inflows into the <br />proposed mine workings. The proposal shov2d include a plan to measure <br />the flow rates of the various inflows, a method to characterize the type <br />of inflows, and an inflow location map. <br />,r~i~,~ ,,,~ t~~a -WOr~:~bs_ <br />/ep d ecrewcG+. ~lou ~~ f;s.'v ~ r • . iZ ~ ~ ~ ~ <br />cc: Jim Pendleton ~' ohC~, ~S <br />Jerry Zimpfer ~ ~S <br />~a <br />~ ~~ <br />~. <br />include quay rterl _y submittal of collected da to . ~ ~ā€ž ; ~ ~ .J Sli bm~~y~ n~ dq-, a <br />q <br />The applicant stnuld revise his statement of "Probable Hydrologic <br />Consequences" to include an analysis of the potential effects on the <br />Fish Creek alluvial aquifer. This analysis should consider both water <br />quantity and quality impacts. Modeling techniques would be appropriate <br />to facilitiate this analysis. <br />~~GI <br />The applicant should revise the proposed ground water monitoring plan to 4hf~ ~~ <br />Rule 2.05.6(3) (b) (iv) `~^kc._( ~ ~~~ <br />