Laserfiche WebLink
<br />T:'PE OR PRI\"i CLEARLY <br />14. Present land use <br />(i.c., agricultural, Industrial, etc.) CO°'~`=~1~~-~=•'ar-d`r=6- <br />15. Proposed future land use _ <br />(Goal of reclamation) - - .... .. <br />I°SLRt;C'PIONS: This aopli.cetien fpm wrist be submitted ir. dualicate t-+d ee.cF, Lcrm oust <br />6e accourpzair_d by the folloeJing information and. items. TS_ r.p~?.ication <br />w~l.l not be processed until complete. See RULE 3 (for Lin~.ted Impact) <br />or RULE 4 (for ~nec:lai 10-dr.y} for addition:_J. quidzncr_. <br />E~iIBIT A - Lera1 Descr <br />The legal description must identify the affected lend and be er::olly adcucte for <br />fieJ.d location of thr_ property. It ern be i1 the fora e° +attes z.,id bonds survey <br />or a description by reference to township, range, and section to at least the <br />nearest que.rter quarter section. S?hera applicable, Ch r. treat zad.ress or lot <br />number(s) may be used. <br />EydIBIT B - Minine Plan <br />This can ~~ a general discussion of the methods. equipment, phases or s rg a of <br />the operation and those portions of land affected by oath. Tt~e pl~.n should be <br />closely correlated with th^ rep and should show where retraction will begin, which <br />dircctiou it ~~ill proceed. <br />E!4iIB;.'1' C - Man <br />This man should be as compraiicasive zs possible in terns of clearly d:fining <br />the permit boundaries and indicating all troeds cr stoc?cpiie areas to be ue,d is <br />connection with the operation. A11 in~:dietely adjacent landowners must be shown:. <br />The closest ouarter section corner, section li.r.e; or any other loceteable point <br />should also be sl:o~+r. on t^.e mp. <br />Ey1iIBIY D - Wildlife, Water Rssouzces, Vegetation and Soils Information <br />Each of the above-mentioned sub;ects must be addressed as outlin:d in th' <br />applicable Rule, under item m:mber ten (10). <br />c.C31.BiT E - Reclamation PI-n <br />Aa with the mining plan, this should be a generel discussion of the methods, <br />equipment, phases or s?ages of Che reclamation process end those portions of <br />land affected by each. If possible, the plan should be closely correlated <br />with the map. If not, the nr.rrative must be cnmprehai:sive enough tc drew :n <br />ac=;gate verbal picture of the expected physical appearance of tt.e arzi after <br />completion of recla>=ation. <br />EXHIBIT F - Proof of Local Government Approval <br />This must be a letter from the local governsant specifying ccnfor~nce with <br />existing zoning regulations. <br />F~HIBIT G - Source of Le4al Right to Enter <br />This could be a copy of the lease, died, abstract of title, or cuzrent tax <br />receipt. In lieu L-hereof, a statement acknowledged by a notary public that <br />the operator has the 1~ea1 right to enter end mien will t,e accepted. <br />*FOR SPECIAL 10-D:.Y PERiriITS 0\LY~r* <br />ECHI$IT H - Reclamatior. Costs <br />If the suety is requested to be less than 52500, the operator cast submit <br />fzcts Co sc~port such request. Othe nr se a surety of $200 will automatically <br />be set. <br />EY1iIBiT I - Te^_is of Governmen_al Contract <br />fhc operator must submit a. copy of the contr=.ct or other proof that. proves the <br />_ necessity of e special 10-day cermit. The operator c•.u°t also submit evidence <br />of the surety provided vitider the governmental contract, if it was required. <br />