monitored is necessary. Information on well location, well elevation, ownership, use <br />(domestic, agricultural, etc.) total depth, baseline yield, baseline water level, <br />measuring point elevations, etc, should be included. Please review this portion of the <br />water monitoring plan and submit new and revised information. <br />17a. In the BBA Water Consultants report referenced above (Exhibit K), one well, <br />permit number 222887, completed in or close to the Ocean Wave coal seam, is <br />identified as having a potential water level change due to mine-related dewatering, <br />from 0 to fifteen(15) feet. Impacts to other wells are not quantified due to estimates <br />that they will not be affected by mining. Please add this well to the proposed <br />monitoring under Part VI of Exhibit AB. <br />176. Based on review of Appendices 1, 2 and 5 presented in the BBA report it appears <br />that two additional wells should be added to the monitoring plan including Well <br />79354 and Well 3759 due to their completion zone in close proximity to the <br />underlying Ocean Wave Coal (see Appendix 1 -Cross-Section A-A'). There is also <br />a house located in T19 S, R70W, Section 11 located south of Brookside very close to <br />the angle of draw and subsidence monitoring zone. There is no registered well listed <br />for this location, but it should be verified if a domestic or livestock well exists at this <br />location. <br />17c. It appears that culverts may be necessary for the south runoff collection ditch where it <br />crosses the haul road adjacent to Chandler Creek and at the inlet to the sediment <br />pond. Please review these two areas and evaluate the need for culverts. <br />18. NP recently took soil samples from 7 holes on the proposed disturbed area. Analysis was <br />conducted at the CSU soil lab by horizon. The baseline sampling as presented in Section <br />2.04.9 of the permit application and in Exhibits F and I is acceptable. <br />Northfield Response: Baseline soil surveys were provided. <br />DRMS response: No response required. Response accepted. <br />19. The last sentence in the first paragraph on page 2.04-Z2 is not clear. I believe it says <br />that at least the top six inches of topsoil will be salvaged prior to disturbance. Please <br />clam this sentence. <br />Northfield Response: Permit text was edited regazding soil salvage depth. <br />DRMS Response: Response accepted and please see comment under question #22. <br />20. The soils map, Map 2, is 1 "=600'. !t is difficult to see what the soil types are on this <br />map. Please provide a larger scale map, minimum 1 " = S00 feet as required by Rule <br />2.10, that clearly delineates the soil types and sampling locations. <br />Northfield Response: Soil Survey, Map 2 was revised to a scale of 1" = 500 feet. <br />