Laserfiche WebLink
<br />Mr. Carwin Bleidt - 2 - July 3, 1986 <br />b. Five (5) subsidence profiles shall be submitted. These <br />profiles, which will be adequately detailed and be certified by <br />a registered professional engineer, should extend between <br />points 1 and 2; 1 and 3; 2 and 3; 2 and 4; 3 and 4. Each point <br />is numbered as per comment (3) above. <br />c. A thorough discussion of the survey results, which also <br />compares the actual subsidence at the site with the projections <br />presented in the permit application. If the results of the <br />survey deviate from the projections of potential subsidence, <br />the implications of the deviations must be presented. <br />I look forward to our meeting of Juiy 4, 1986 at 4 p.m. at your office. <br />If you have questions or comments, please contact me. <br />Sincerely, <br />Steven Renner <br />Hydrologist <br />SR/srs <br />cc: Peter V. O'Connor <br />James Pendleton <br />Michael Savage <br />1998E <br />