My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13125
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:24 PM
Creation date
11/19/2007 2:38:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Application Correspondence
Doc Date
7/23/1982
Doc Name
MINOR REVISION FOR POWDERHORN COAL CO PN C-041-81 SEDIMENTATION CONTROL PLAN CAMEO 1 AND ROADSIDE
From
POWDERHORN COAL CO
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Jim Herron <br />July 21, 1982 <br />Page 2 <br />Refuse Pile may have been affected. The new ditch has been separated into <br />two (2) sections. Lower Catch Ditch Number 1 drains to Sediment Pond Number <br />8 and Lower Catch Ditch Number 2 drains to Sediment Ponds number. <br />A NPDES Discharge Point #005 has been applied for for Sediment Pond No. 9 on <br />Colorado Discharge Permit CO-0027146. <br />CAMEO N0. 1 MINE - See Exhibits 8B, 20, 21 <br />The 24", 1/2 round spillways have been changed. The revised design calls for <br />36" CMP drop inlets into 36" CMP culverts. Debris skimmers and 6-inch de- <br />watering devices will be installed on the drop inlet to reflect existing conditions. <br />UNIT TRAIN LOADOUT - See Exhibits 11B, 21 <br />A 600 gpm portable pump will be available on the property to dewater the ponds <br />after a 10-year, 24-hour precipitation event. <br />Upon field inspection it was found that drop inlets had been installed on the <br />30" CMP that pass through the rail loop at NPDES Discharge Points 009 and 010. <br />NORTH DECLINE - See Exhibits 126, 21, 22 <br />The drainage channel was revised at the inlet and outlet. The three 48-inch <br />culverts in the drainage channel were deleted. The inlet of the drainage <br />channel was widened to realistically fit actual field conditions. The out- <br />let of the channel was revised to depict where the channel will actually <br />discharge into the State Highway's channel and culvert. The culverts were <br />deleted since this access to the North Decline is no longer required. <br />The West Diversion Ditch No. 2 was deleted. The revised inlet on the drain- <br />age channel will catch the run-off that the West Diversion Ditch No. 2 was <br />going to intercept. <br />If you should have any questions, please contact me. <br />Sin y ~d~L~ <br />Henry A. Bar <br />Environmental Specialist <br />HAB:tkh <br />Enclosure <br />cc: Bruno Redolfi <br />
The URL can be used to link to this page
Your browser does not support the video tag.