Laserfiche WebLink
<br />9. WITH RESPECT TO THE EVALUATION OF SPECIES DIVERSITY ON RECLAIMED AREAS, KERR <br />COAL IS REQUIRED TO WORK WITH THIS DIVISION TOW4RDS THE ESTABLISHMENT OF <br />MUTUALLY ACCEPTABLE SUCCESS CRITERIA. SUCH CRITERIA SHALL BE FORMULATED AND <br />AGREED TO NO LATER THAN SEPTEMBER 30, 1981. <br />10. WITH RESPECT TO KERR COAL'S PLAN FOR MITIGATION OF POSSIBLE IMPACTS ON SAGE <br />GROUSE, PRECISE LOCATIONS FOR FERTILIZER APPLICATION MUST BE SUBMITTED EACH <br />YEAR TO THE MINED LAND RECLAMATION DIVISION FOR APPROVAL, AT LEAST 30 DAYS <br />PRIOR TO THE SCHEDULED FERTILIZATION DATE. SUCH APPROVAL SHALL BE BASED ON A <br />COMPARISON (TO BE PROVIDED BY KERR COAL) AT AREAS TO BE FERTILIZED WITH AREAS <br />TO BE DISTURBED, RELATIVE TO SAGE GROUSE HABITAT TYPES AS SHOWN ON MAP 23. <br />A DISCUSSION OF THESE AREAS WITH RESPECT TO SAGE GROUSE USE AND ACCESSIBILITY <br />TO THE BIRDS MUST ALSO BE PROVIDED. <br />11. KERR COAL IS DIRECTED TO SUBMIT TO THIS DIVISION ON A REGULAR BASIS DATA <br />FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PAGE 81(i-124 OF <br />THE APPLICATION, TO DETERMINE WHETHER FUTURE OPERATIONAL EXPERIENCE IS <br />CONSISTENT !/ITX TXE PROJECTED SWELL FACTOR OF 24$. <br />12. NO LATER THAN 90 DAYS PRIOR~TO THE SCHEDULED COMMENCEMENT OF OPERATIONS OiJ <br />THE SECOND BONDING INCREMENT (AS SHOWN ON MAP 4b) KERR COAL MUST SUBMIT <br />DETAILED WORST CASE RECLAMATION COST ESTIMATES TO THE DIVISION FOR REVIEW. <br />RNY REQUIRED ADDITIONAL 80ND AMOUNT MUST BE SUBMITTED AND APPROVED PRIOR TO <br />TXE COMMENCEMENT OF OPERATIONS ON THAT INCREMENT. R SIMILAR PROCEDURE SHALL <br />BE FOLLOWED FOR ANY SUBSEQUENT INCREPfENTS. <br />-z- <br />