Laserfiche WebLink
~-~ '~ -z- <br />uY~ <br />.x <br />~, <br /> <br />O <br /> <br />4 <br /> <br />1 A <br /> <br />/~ <br /> <br />\1'n <br />,2.05.4 - Reclam <br />2.05.5 - Post-Minin <br />2.05.6 - Miti ation of Minin m <br />(1) Air Pollution Control '~ <br />ish and Wildl'f <br />3 Prnraction of Hvdrolggjs <br />~(4} Protection of Public ParKs <br />~ and Historic Pl <br />5) Surface Mining Near <br />Under round Minin <br />6 Subsidence Survey, <br />Subsidence Monitoring, <br />and Subsidence Control <br />Plan <br />2.06.2 - Ex erim nt 1 Practi .•1' in <br />2.06.3 - i•lountainto Removal Minin <br />2.Oti.4 - Stee Slo a Minin <br />2.06.5 - Variance from Approximate <br />Ori final Contour <br />2.06.6 - Prime Farmlands <br />2.Oti.7 - Variances for Delay in <br />Contem oraneous Reclamation I ~ <br />2.06.8 - Alluvial Valle Floors <br />2.06.9 - Au erin <br />2.06.10 - Coal Processing Plants and <br />Support Facilities not Located <br />at or Near Mine Sit <br />2.06.11 - In Situ Proc 'n ~ <br />.0 .6 - Criteria for Permit Approval or <br />Denial <br />.l - i+laps and Plans <br />Rule 3 - Bonding ~ <br />4.02 - Signs and Markers <br />- Roads <br />4.04 - Support Facilities <br />4.05.2 - water Qua ,ty ~ an ar s an <br />Effluent Limitations <br />4.05.3 - Diversions and Conveyance of <br />Overland Flow <br />4.05.4 - Stream Channel Diversions <br />4.05.4 - Sediment Control Measures <br />4.05.6 - Sedimentation Ponds <br />4.05.7 - Dischar a Structures <br />4.05.8 - Acid-Forninq and Toxic-Forming <br />S uil <br />