Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />COAL COMPANY <br />May 17, 1982 <br />Mr. Jim Herron <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />RE: Roadside and Cameo No. 1 Mines <br />File No. C-041-81 <br /> <br />t,~l„ 1' 1 7 id82 <br />MINtD LAND H~t;I.AMATION <br />Cale. Dept. of Natural Resources <br />Dear Jim: <br />The following responses to issues and stipulations in the draft decision <br />document are being transmitted to the Division this date: <br />•A plan for sealing drilled holes. <br />•Roadside Mine post-mining topography map revised 5/15/82 at Jim Herron's <br />request (phone call from Jim on 5/13/82). <br />•Vegetation discussion to eliminate stipulations 9, 10, and 11. <br />•Final Report, determination of the Presence of an Alluvial Valle}• <br />Floor in the Vicinity of Cottonwood and Rapid Creeks. <br />•Some wording corrections for information previously submitted. <br />Sincerely, <br />/~~ ~2 d ~ ~-Q~G ~-Ci <br />Bruno A. Redolfi / <br />Chief Engineer <br />/lr <br />Enclosures <br />cc: Dale Fenwick <br />Bill Tate <br />POWDERHORN COAL COMPANY • P.O. BOX 1430 • Palisade, Colorado 81526 • (303) 464-7951 <br />