My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12992
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:20 PM
Creation date
11/19/2007 2:36:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982054
IBM Index Class Name
Application Correspondence
Doc Date
7/5/1983
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />Stipulation No. 3 <br />THE PERMITTEE MUST SAMPLE VEGETATIVE COVER, HERBACEOUS PRODUCTIVITY <br />AND SHRUB DENSITIES FOR THE PINYON-JUNIPER AND MOUNTAIN SHRUB <br />VEGETATION COMMUNITIES AND CORRESPONDING REFERENCE AREAS DURING THE <br />SUMMER OF 1983 AND PRIOR TO DISTURBANCE IN THESE COMMUNITIES. THE <br />PERMITTEE MUST PROVIDE A WRITTEN STATISTICAL EVALUATION OF SAMPLE <br />ADEQUACY AND A COMPARISON SHOWING THE STATISTICAL EQUIVALENCY <br />BETWEEN THE PROPOSED DISTURBED AREA PLANT COMMUNITIES AND THE <br />PROPOSED REFERENCE AREAS. A WRITTEN REPORT OF THIS WORK MUST BE <br />SUBMITTED TO THE DIVISION WITHIN 60 DAYS OF COMPLETION OF THE <br />SAMPLING. <br />Stipulation No. 4 <br />A THREATENED AND ENDANGERED PLANT SPECIES SURVEY MUST BE PERFORMED <br />ON THE PERMIT AREA PRIOR TO ANY SURFACE DISTURBANCE OUTSIDE THE <br />DRYLAND CROPLAND AREA. A WRITTEN REPORT MUST BE SUBMITTED TO THE <br />DIVISION WITHIN 30 DAYS AFTER THE COMPLETION OF THIS SURVEY. IF <br />THE SURVEY SHOWS THAT NO THREATENED OR ENDANGERED PLANT SPECIES <br />OCCUR ON THE SITE, THE REQUIREMENTS OF SECTION 2.07.6(2)(n) WILL <br />HAVE BEEN MET. <br />Stipulation No. 5 <br />WITHIN 120 DAYS OF PERMIT APPROVAL, THE OPERATOR SHALL PROVIDE A <br />SINGLE, COMPREHENSIVE PLAN FOR THE DIVERSION OF THE EPHEMERAL <br />DRAINAGE IN CARBON JUNCTION CANYON TO THE DIVISION FOR REVIEW. THE <br />PLAN SHALL BE CERTIFIED BY A QUALIFIED, REGISTERED PROFESSIONAL <br />ENGINEER. THE PLAN WILL INCLUDE A LONGITUDINAL PROFILE, A <br />REPRESENTATIVE CROSS-SECTION, AND SHALL INCLUDE CHANNEL SIZING AND <br />FLOW VELOCITY CALCULATIONS. INCONSISTENCIES CONCERNING THE USE OF <br />RIPRAP, CHANNEL DIMENSIONS, AND DESIGN CALCULATIONS SHALL BE <br />REMOVED. IN ADDITION, MAP 5-4 SHALL BE REVISED TO REFLECT THE <br />FINAL POSITION OF THE DIVERSION CHANNEL FOLLOWING THE REMOVAL OF <br />SEDIMENT POND N0. 2. CONSTRUCTION OF THE PERMANENT OVERBURDEN <br />STOCKPILE SHALL NOT BEGIN UNTIL AN ACCEPTABLE PLAN HAS BEEN <br />APPROVED BY THE DIVISION. <br />Stipulation No. 6 <br />IN ORDER TO SIMPLIFY THE COMPARISON OF PRE-MINING, MINING AND <br />POST-MINING TRANSECT PROFILE SURVEY DATA, THE DIVISION DEEMS IT <br />APPROPRIATE TO REQUIRE PUEBLO COAL, INC. TO PERFORM THE PROPOSED <br />TOPOGRAPHIC PROFILE SURVEYS ALONG THOSE TRANSECTS USED TO PREPARE <br />THE CROSS-SECTIONS DEPICTED WITHIN APPENDIX 4-2a WITHIN THE AMENDED <br />PERMIT APPLICATION DOCUMENTS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.