My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12967
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:18 PM
Creation date
11/19/2007 2:36:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1987072
IBM Index Class Name
Application Correspondence
Doc Date
5/5/1987
Doc Name
REMAINING ADEQUACY CONCERNS-LA PLATA 1 PERMIT APPLICATION
From
MLRD
To
PETER OCONNOR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 w <br />Task # 4 -Compaction of portal bench and access road cut. The size of <br />the water truck was reduced from 7,000 gallons to 3,500 <br />gallons, resulting in an hourly truck cost reduction from <br />$99.77/hr to 550.70/hr. This worked out to a task cost <br />reduction from $16,297.36 to $12,009.13. <br />Task #11 - Portal sealing and backfilling. The number of entries was <br />reduced from 4 to 3 (one has been sealed), and the dimension <br />of each entry was reduced from 20'w x 8'h to 20'w x 6'h: The <br />net effect of these changes on the estimate was a reduction in <br />cost from $7,104.00 to E3, 996.00. <br />Task #12 - Structural demolition work. The coal bin storage structures <br />and scale were deleted from the estimate as these will be left <br />on-site as part of the proposed post-mining land use (hay <br />storage). The proposed conveyor system and coal bin <br />superstructure (sorter/crusher) were added to the estimate: <br />The net effect of these changes on the structural demolition <br />estimate was a reduction in cost from 55,599.54 to $4;569:88: <br />Task #14 - Mobilization/Demobilization. The estimate cost for <br />transporting the water truck to and from the job site was <br />reduced from 5299.91 to $152.10, resulting in a net task cost <br />reduction from $2,499.42 to $2,351.61. <br />As can be seen from the attached revised reclamation cost summary worksheet; <br />the net effect of these changes is to reduce total estimate reclamation costs <br />from $68,300.00 to 558,200.00. <br />The applicant needs to revise appropriate sections of the permit application <br />to reflect these recent amendments to estimated reclamation costs: <br />/sak <br />9477E <br />
The URL can be used to link to this page
Your browser does not support the video tag.