SPECIFICATIONS T-OVERN <br />• <br />THE COfJSTRUCTIOf! OF A <br />SEDIMEPJTATION POPJD <br />Prepantlea of Fonadstloa for Dam-All vegetable matter of every description, including root to a depth of two <br />feet, shall be removed from the entire area upon which the dam will rest, together with Doggy or unstable materials <br />and deposited outside the toes of the dam. The banks of the stream channel shall be dressed to a slope o[ about 155:1. <br />A bonding trench, with sloping sides and a bottom width of not less than 5 feet and depth of 4 feet, shall then be <br />excavated beneath the center line o[ the dam the full length thereof, which trench shall be refilled with the most imper- <br />vious material available. The foundation of the dam shall then be lightly plowed lengthwise of the dam, to provide <br />proper contact between the foundation and the dam embankment. <br />Plaelai of Dam EmDaakment-The materials shall be placed in the bonding trench and in the embankment of the <br />dam in layers not exceeding 8 inches in thickness, after which each layer shall be thoroughly compacted by o heavily <br />loaded dlc cultivator, a corrugated or sheep's foot roller, the treads o[ a caterpillar or trucks, or by livestock used in the <br />construction. During the construction period, the top of the embankment shall be maintained as a horizontal plane the <br />full width and length thereof, and no side dumping of materials shall be permitted. The materials shall at all Umes <br />contain sufficient moisture to provide proper compaction. Puddling of material with water shall not be permitted. <br />No frozen material or large clods or stones shell be incorporated in the dam. The upstream face of the dam shall be <br />tonstructed with a slope not steeper than 255:1, and the downstream face on a slope not steeper then 2:1. The crest or <br />top of the finished dam shall be not less than B feet in width. <br />The upstream two-thirds of the dam shall be constructed of the most impervious materials, such es clay loam, or a <br />mixture of clay end sand, end the downstream one-third of more pervious material, such as sand or gravel. The up- <br />stream face of the dam shall be adequately protected against wave action by stone riprap, or other suitable materiel <br />when required. <br />Ontlet-Should the state engineer so require, there shall be located bznealh the dam an outlet pipe not less than 0 <br />inches In diameter, equipped with a control valve attached to the upstream end of the pipe, together with suitable <br />mechanism for operating the valve. Such outlet pipe shall be provided with cutoff cullers. The pipe shell be placed In e <br />trench bottomed in stable formation, and shall be completely surrounded with well compacted impervious material. <br />~~~j ~~ C7 =_J® <br /> <br />f'r1E;Y 21 190 <br />- e ,.., - .r o.. <br />t.. <br />- ~ ~~ <br />~. , <br />.~ ~_ <br />U.. o o - t+-~-~ <br />_ ~~ <br />c., au r..,.. <br />~ :...J <br />-> r.., <br />MAXIMUM CROSS~SECTION OF DAM <br />N!14)rn, ~_^.fdD R~CLPh':AT101~J <br />C]lii. UC;`l. 01 ;V 31!lf3 HCSOI!fCOS <br />Note: Pond embankment to be constructed in accordance <br />with these plans and specifications, under the <br />supervision of a registered professional <br />engineer. <br />Examined for structural weakness and erosion upon <br />completion of ocnstruction and after each major <br />storm event: <br />Removed, regraded and renegotiated upon abandonment. <br />Iiorrsw Plfa-Pits, from which materials are taken to build the dam, shall be cleared of all vegetable matter, and <br />no material shall be borrowed within a distance of 50 feet o[ any part of the dam. Materiel excavated from the aplll- <br />way, when suitable, may be used In building the dam. <br />