Laserfiche WebLink
r~ <br />U <br />contour. As mentioned earlier, the sediment removed periodically from <br />the retention pond should be stockpiled and used for cover material as <br />a part of the reclamation plan. It is our opinion that the majority of <br />this sediment will be eroded top soil and should therefore provide a <br />good basis for re-vegetation. <br />F. M. FOX 5 /ASS,OC~-IATES, IN/C. <br />~jLu-ce /ivy - L <br />Bruce A. Florquis P.E. <br />Vice President <br /> <br />BAF/gw <br />Copies: 3 <br /> <br />p. r~C <br />~~,,~~ r~%.i <br /> <br />~ :014412 <br />.„ <br />.~ •, Fti .~ <br />Op <br /> <br />8 <br />