My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12938
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:17 PM
Creation date
11/19/2007 2:36:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Application Correspondence
Doc Date
8/12/1981
Doc Name
REVIEW OF WYOMING FUEL COMPANYS PRELIMINARY ADEQUACY RESPONSE CONCERNING THE TEMPORARY OVERBURDEN P
From
MLR
To
RICH DOMINGUE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORA00 RAC HARD O. ~. Gev cam, III'll lll'll I'II'll <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director 99y <br />MIlVED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 839-3567 <br />David C. Shelton <br />Director <br />August I2, 1981 <br />TO: Rich Domingue <br />FROM: Jim Pendleton <br />SUBJECT: Review of Wy mi uel Company's Preliminary Adequacy Response <br />Concerning the Temporary Overburden Pile at the Canadian Strip <br />Mine. <br />Wyoming Fuels has detected a drafting error within its original application <br />which corrects their Homographic calculations concerning the static slope <br />safety factor of their temporary overburden pile. <br />Because of the temporary nature of this pile and the limited hazard potential <br />involved to men and equipment, I recommend that we accept Wyoming Fuel Company's <br />agreement to "frequent visual monitoring of the slopes to detect and mediate <br />any developing problems..." (Wyoming Fuel Company's response to preliminary <br />adequacy review). <br />Specifically, I recommend that you include in our permit finding document the <br />following stipulation: <br />WYOMING FUEL COMPANY IS DIRECTED TO HAVE ITS OVERBURDEN STOCKPILE INSPECTED <br />ANNUALLY BY A REGISTERED PROFESSIONAL ENGINEER OR PROFESSIONAL GEOLOGIST AND <br />TO SUBMIT A LETTER REPORTING THE RESULTS OF THAT INSPECTION, CERTIFIED BY THE <br />PROFESSIONAL CONDUCTING THE INSPECTION, WITHIN 10 DAYS FOLLOWING COMPLETION OF <br />THE INSPECTION. IN ADDITION, IN THE EVENT THAT EVIDENCE OF INSTABILITY IS FOUND, <br />WYOMING FUEL COMPANY SHALL SUBMIT A PLAN FOR MEDIATION OF THE PROBLEM TO THE <br />DIVISION FOR APPROVAL. UPON RECEIPT OF APPROVAL, WYOMING FUEL COMPANY SHALL <br />PROCEED TO MEDIATE THE PROBLEM IN CONFORMANCE WITH A TIME SCHEDULE CONTAINED <br />WITHIN THE APPROVED PLAN, IN A TIMELY MANNER. <br />cc: Jim Kent <br />
The URL can be used to link to this page
Your browser does not support the video tag.