My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12932
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12932
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:17 PM
Creation date
11/19/2007 2:36:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Application Correspondence
Doc Date
3/18/1982
Doc Name
VENTO SEAM EXTRACTION NEWLIN CREEK DORCHESTER BOUNDARY FN 79-39
From
DORCHESTER COAL CO
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br /> <br /> <br />~I I I I~ I I~ I I~ II~~ I~~ <br />~~•""`°"`~°, Dorchester Coal Company 999 <br />o~ Colorado Operations <br />2795 Skyline Court <br />- ~ - ~- Grand lun coon, CO 81501 <br />°rOU°°c°° (303) 245-6370 <br />March 18, 1982 ~~`~~~~~~ <br />Colorado Mined Land Reclamation Division MI-',(~ 1 ti 1982 <br />1313 Sherman St., Room 423 <br />Denver, Colorado 80203 MINED LAND RECLAMATION <br />Colo. Dept. of Natiral Resources <br />Attn: Ms. Carol Russell <br />RE: Vento Seam Extraction, Newlin Creek-Dorchester Boundary <br />File No: 79-39 <br />Dear Carol: <br />On December 16, 1981, Dorchester Coal received approval from <br />your office to allow barrier pillar removal procedures to be <br />initiated by Newlin Creek Mining along the boundary common to <br />both operations. Newlin Creek is currently in the retreat <br />phase of their operations along the boundary and in so doing <br />will be removing coal from the Dorchester side of the boundary <br />under a contractual agreement with Dorchester. It appears <br />that these activities would fall under the December approval. <br />If that is the case, please consider this material as merely <br />supplemental to the December revision. If not, consider this <br />letter and enclosed maps to be a formal request for a minor <br />revision to the Dorchester #1 permit. Because of the timing <br />of the Newlin Creek activities it is essential that an approval <br />be forthcoming as quickly as possible to ensure maximum <br />resource recovery. <br />The enclosed map, Exhibit A, depicts the areas to be mined <br />by Newlin Creek under the agreement. Newlin Creek will <br />simply use an extension of their currently approved room and <br />pillar mining technique to extract coal in the Vento Seam as <br />shown on exhibit A. The total area to be mined underground <br />will be approximately 4.17 acres. Additional surface distur- <br />bance due to subsidence will be minimal if any. While we <br />anticipate extraction from all five areas shown on the map, <br />areas "B" and "E" may have recovery restricted by faulting <br />or proximity to old workings. The final determination will <br />be based upon safety and economic factors as the mine progresses. <br />Information pertaining to the overall geology of the area is <br />included in the Dorchester #1 and Newlin Creek applications. <br />As you know. Dorchester's operations, conducted in the under- <br />A Subsidiary of Dorchester Gas Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.