Laserfiche WebLink
-6- <br />Description of the Operations and Reclamation Plan (con't) <br />After mining ceases the disturbed area at the loadout will be cleared of <br />coal refuse, and surface will be ripped, the tracks removed, the embankments <br />regraded and all disturbed areas will be tops oiled and seeded. The loadout <br />facilities area will be reclaimed to be used for hay production, Reclamation <br />success will be determined on the basis of a comparison with the production <br />of hay from an adjacent area. <br />