My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12885
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:14 PM
Creation date
11/19/2007 2:35:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Application Correspondence
Doc Date
8/23/1983
Doc Name
Issuance Letter and Permit
From
MLRD
To
SNOWMASS COAL CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HTTACHMENT A <br />Stipulation No. 1 <br />WITHIN ONE HUIVDREU ANU TWENTY (120) DAYS OF PERf~IIi ISSUIUVCE, <br />SfVOWhIASS COAL COi+iPANY SHALL INSTALL ADDITIONAL MONITURIfrG WELLS TU <br />MOiVITOR THE UPPER SANDSTONE OF THE WILLIa4S FORK FURr1ATIUN. THESE <br />h1UfVITORING WELLS hIAY BE DRILLED WITHIN THE IvO. 3 MINE TO REDUCE <br />DRILLING COSTS. ALL MONITORING WELLS SHALL BE: 1) PROPERLY <br />SCREENED WITHIN THE ENTIRE SANDSTONE UNIT, AfVD 2) PROPERLY SEALED <br />AT THE TDP ANU BOTTOM TO PREVENT THEIR DESTRUCTION. THE SPACING OF <br />THE ADDITIONAL MONITORING WELLS SHALL Bt: SUBMITTED TU THE DIVISION <br />FOR APPROVAL 60 DAYS FOLLOWING ISSUANCE OF THIS PERf4IT. <br />Stipulation No. 2 <br />ALL CULLUVIAL MATERIAL AT THE RUFUSE <br />NUN-TOXIC, NON-CUh1BUSTIBLE COVER FOH <br />ANALYZED ANU APPROVED BY THE DIVISION <br />CRITERIA FOR SUITABILITY FOR TOPSOIL <br />Stipulation No, 3 <br />PILc USED AS TOPSOIL OR <br />THE REFUSE P[LE MUST BE <br />A5 MEETING THE ESTABLISHED <br />AND/OR SUBSOIL. <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE f4UST PROVIDE <br />THE DIVISION WITH A COMPREHENSIVE TREE ANU SHRUB PLANTING PLAN. <br />THE PLAN MUST INCLUDE A LIST OF SPECIES TU BE PLANTED, NUMBERS OF <br />ENCH SPECIES PER ACRE AfvD ACRES TU BE PLANTED. THE PLANTING PLNN <br />MUST ALSO DESCRIBE THE PATTERN 7U BE UTILIZED 1N PLANTIiG THE PLANT <br />MATERIHLS, THE SEASON OF 7HE YEAR OF PLANTING NNU NLL LOCATIONS <br />'WHICH WILL BE PLANTED. <br />Stipulation No. 4 <br />WITHIN 90 DAYS AFTER <br />THE DIVISION WITH NN <br />DENSITY AT THE MINE <br />Stipulation No. 5 <br />WITHIN 90 DAYS AFTE <br />THE DIVISION WITH A <br />FUR THE REVEGETATEU <br />Stipulation flo. 6 <br />PERMIT ISSUNNCE, THE PERMITTEE MUST PROVIDE <br />NCCEPTABLE SUCCESS CRITERIN STANDARD FUR SHRUB <br />SITE. <br />R PERMIT ISSUANCE, THE PERf4ITTEE MUST PROVIDE <br />N ACCEPTABLE SPECIES DIVERSITY SUCCESS STANDARD <br />AREAS OF THE MINE. <br />WITHIN 90 DAYS NFTER PERMIT ISSUANCE, THE PERhIITTEE i~1UST PROVIDE <br />THE DIVISION WITH ACCEPTABLE SUCCESS STAIIDARDS FUR COVER ANU <br />PRODUCTIVITY FOR THE AREAS TU BE RECLAIMED A7 THE LUADUUT <br />FACILITY. ALSO, SPECIES DIVERSITY NND tVOUDY PLANT DENSITY <br />STANDARDS MUST BE PROVIDED FOk THE TRUCK DUMP - URYLArIU GRASSLAND <br />AREA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.