My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12823
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:12 PM
Creation date
11/19/2007 2:34:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Application Correspondence
Doc Date
8/1/1997
Doc Name
LORENCITO MINE ADEQUACY RESPONSES C-96-084
From
GREYSTONE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />July 31, 1997 <br />Lorencito Mine Adequacy Responses <br />Page 2 of 2 <br /> <br />Comparison of Loose and Bank Yardage for Unconsolidated Materials <br />Material Loose Density <br />(#/yd') Bank Density <br />(#/yd') Ratio of Bank to <br />Loose Density <br /> <br />Loam 2100 2600 1.23 <br />Clay and Gravel 2500 3100 1.24 <br />Decomposed Rock and Earth <br />(25%/75%) 2650 3300 1.24 <br />Soils at the site are either loamy, clay loamy, or rocky clays or clay loamy. We believe that the <br />20% estimate of swell is an adequately accurate representation of swell. <br />Table 2.05.3-2 includes a commitment to revise the table once per permit term. <br />According to our files, the April 23, 1997 version of page 2.05-35 has only one paragraph, and <br />it is the top paragraph of the July 1, 1997 submittal of page 2.05-35. It is not clear what <br />discrepancy needs to be modified. Page 2.05-35 was modified to describe the placement of <br />topsoil throughout the surface mine. <br />LCC would like to use the Division's estimate for reclamation and tie bonding values to different <br />phases of the mine plan. Table 3.02.2-17 is in the process of modification to accurately <br />represent a schedule for bonding associated with the costs of reclamation, and will be transferred <br />to you as soon as it is ready. <br />~~ <br />Assistant Project Manager <br />Sincerely, <br />~~-'I ~ 1 ~ <br />Cathy Begej <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.