Laserfiche WebLink
Flom: N9Wern P. Balaz To:.Oave Berry Oab: p/5Ip5 Tlme: 1742:99 Pape 1 of 1 <br />Balaz & Associates, Inc. <br />KLH Engineering Group <br />O.C. #2 Mine <br />Reclamation Plan Development <br />Date; 09/02/95 <br />Revised: 09/04/95 <br />Pro'ect Schedule <br />ask Descri tion Start Date Duration <br />Site visit, survey, and soil sample 09/11/95 1 Day <br />Soil sample testing 09/12/95 1 Week <br />Edit survey data to develop as built <br />opographic map 09/12/95 1 week <br />Develop hydrologic plan 09/18/95 1 Week <br />Slope stability Anal is 09!18/95 1 Week <br />Develo st minin to o raphic ma 09/25/95 2 Da s <br />Develop cross sections and volumes 09/27/95. 1 Day <br />ssemble Technical Revision package 09/27/95 2 Days <br />Submit Technical Revision package to <br />Aerator 09/30/95 <br />Follow u As Re wired 10/02/95 2 Weeks <br />