Laserfiche WebLink
From: Wllllam P. Delex To: Dave Harty ~ Date: plSIBS TMe: 1216:01 Pape 2 of 9 <br />Ba1az & Associates, Inc. <br />203 Sunset Circle Palisade. Colorado 81526 (970) 464-7942 <br />September 5, 1995 <br />Ms. Christine Johnston <br />Mr. Dave Berry <br />Division of Mines and Geology <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Re: Cost Proposal-OC #2 Mine <br />Dear Christine and Dave: <br />Please fmd attached Ute cost proposal and project schedule to develop the reclamation plan for the <br />OC #2 Mine. Man-hours have been redishibuted from follow up into the CARD portions of Tasks <br />1 3 and 4. Man-hours have been added in the field survey portion and to assemble the Technical <br />Revision package. The field survey is assumed to be done in one long day by two men raffier than <br />having a professional engineer and a two man survey crew. By working one long day, the cost of <br />motels are eliminated. It has been assumed that the sedimentation pond will have to be surveyed to <br />update the existing site topographic map. Sufficient points will be obtained to generate a new site <br />topographic map based on relative elevations. Soil samples will be collected in the disturbed area <br />to provide data on the slope stability analysis for fire regrading plan and post mining topography <br />development. If no surveying is needed itr the field, ttten the man-(tours required in the field <br />should be lower. The redistribution of man-hours from the follow up phase appears reasonable as <br />Balaz & Associates and Ki,H intend oft reviewing aspects of the project with the operator and <br />Division as questions arise. By workutg together, dte time for follow up should be lower. <br />The cost proposal does not include allowances for insurance yet as we are finalizing the costs. We <br />anticipate havutg the certificates and costs by Wednesday, September 6, 1995. Prices yuoted in <br />fire attached schedule are valid for 30 days. If purchase order and authorization [o proceed aze not <br />received witlun 30 days, the cost proposal is subject to change witllout notice. C1lutges to t11e <br />scope of work will require revrcw of tl1c project budget to see if a cost adjusotteltt is required. <br />The project schedule has the Tecluucal Revision being crnnpleted by September 30, 1995 <br />assuming that the project starts on September 11, 1995. if the project start date is delayed more <br />